Penghalang yaiku apa wae sing nyarepake tim lan tim ora bisa gampang ngatasi awake dhewe. Tugas Scrum Master yaiku nggawe penghalang katon, mutusake sapa sing paling cocok kanggo nghapus saben siji, lan nterusno — nglairake tim kanggo ngatasi sing cilik dhewe.
Alur kerja sederhana
text
1. SURFACE capture impediments (standup, board, retro)
2. TRIAGE team-solvable? coach them. Org-level? escalate.
3. OWN assign an owner and a next action with a date
4. TRACK keep an impediment log; review until cleared
5. PREVENT feed recurring blockers into the Retrospective
Conto nyata
Siji tim diblokade amerga akses menyang API pihak katelu butuh tim keamanan rong minggu. Scrum Master nyakaling menyang manajer teknik, negosiasi jalur cepet, lan sawise nglairake tim ngatur ulang karya supaya tetep produktif.