Impediment hu xi ħaġa li tpoġġi l-ekwippa u l-ekwippa ma tistax faċilment tissolvi bihiex. Il-kompitu tal-Scrum Master huwa li jagħmel l-impedimenti viżibili, iddeċidi liema huwa l-aħjar pożizzjonat biex neħħi kull wieħed, u segwi — tħarrix l-ekwippa biex tneħħi dawk ż-żgħar bihiex.
Fluss tax-xogħol sempliċi
1. SURFACE capture impediments (standup, board, retro)
2. TRIAGE team-solvable? coach them. Org-level? escalate.
3. OWN assign an owner and a next action with a date
4. TRACK keep an impediment log; review until cleared
5. PREVENT feed recurring blockers into the Retrospective
