Risiko teknis yaiku apa wae sing bisa nggawe pengiriman metu jalur utawa pecah ing produksi, hal-hal sing ora dikrungu, dependensi sing rapuh, wates penskalaan, titik gagal tunggal. Tugas TL yaiku nggabungake risiko awal lan ngurangi kanthi sengaja, amarga risiko luwih murah kanggo ditangani sadurunge kowe wis nggawe ing upune.
Carane ngatur risiko
1. IDENTIFY — what could go wrong? (unknowns, deps, scale, security, people)
2. ASSESS — likelihood x impact. Focus on the high-high quadrant.
3. ATTACK the biggest unknowns FIRST — spike, prototype, load-test
4. MITIGATE — reduce likelihood or blast radius (redundancy, flags, fallbacks)
5. MONITOR — track known risks; have a plan if they materialize